arrival - 2023-01-12

Hello everyone
I use CODESYS Control for Linux SL 4.6.0.0 and I have such a problem, when restarting the controller, the Ethercat task exceeds the allowable cycle time of 500 microseconds, this is critical for me, with normal operation, the cycle time is usually 100 microseconds. I have run test applications in which there is no code, but only EtherCAT master and slave devices are present, the problem remains. How can I fix this problem