I have a project in which I need to make a graphic each 500 ms in codesys visualization , It should have this 2 features.
1st-ZoomIn , zoomOut and navigation between different intervals (Posible with trend not posible with trace).
2ndSave the data to a file , and reset the graphic with a trigger (Posible with trace not posible with trends.
I'm pretty sure that should be a simple way to do this.. but I don't find it.
Thanks in advance!!!
If you would like to refer to this comment somewhere else in this project, copy and paste the following link:
Hi Guys:
I have a project in which I need to make a graphic each 500 ms in codesys visualization , It should have this 2 features.
1st-ZoomIn , zoomOut and navigation between different intervals (Posible with trend not posible with trace).
2ndSave the data to a file , and reset the graphic with a trigger (Posible with trace not posible with trends.
I'm pretty sure that should be a simple way to do this.. but I don't find it.
Thanks in advance!!!