Ulvis - 2021-12-22

Can this be found?
Is the build info shown in the build output messages exposed through some compile time constant variables?

For contractual reasons, the end customer requires some documentation regarding spare capacity of the commissioned controller.
I was thinking this should be obtainable and reportable at runtime for the SCADA system to display in an info page or something.

Any clues?